{"id":16051,"date":"2026-11-02T10:00:00","date_gmt":"2026-11-02T08:00:00","guid":{"rendered":"https:\/\/incert.bg\/new-general-terms-and-conditions-for-certification-contracts\/"},"modified":"2026-11-16T21:20:52","modified_gmt":"2026-11-16T19:20:52","slug":"new-general-terms-and-conditions-for-certification-contracts","status":"publish","type":"post","link":"https:\/\/incert.bg\/en\/new-general-terms-and-conditions-for-certification-contracts\/","title":{"rendered":"New General Terms and Conditions for Certification Contracts"},"content":{"rendered":"<p>INCERT Ltd applies the General Terms and Conditions for Certification Contracts (D 03-01), which replace the former \u201cCertification Rules\u201d. They form an integral part of all certification contracts, including those already in force.<\/p>\n<p>The most significant change relates to the new standard ISO 19011:2026. The certification body now applies it when planning and conducting audits, alongside ISO\/IEC 17021-1. The General Terms and Conditions therefore describe more clearly remote audits and combined audits, in which part of the team works on site while another part joins remotely. The method is determined for each audit according to the risk assessment and its objectives. The client and the certification body agree in advance on the technologies to be used and on the actions to be taken in case of technical problems.<\/p>\n<p>Confidentiality has also been strengthened. Photographs, recordings and screenshots during an audit are taken only with the client\u2019s consent. Copies of documents and records are kept as confidential information and are destroyed when no longer needed. Personal data is processed in accordance with Regulation (EU) 2016\/679 and the INCERT Privacy Policy.<\/p>\n<p>Several specific changes worth knowing about:<\/p>\n<ul>\n<li><strong>Nonconformities.<\/strong> Each nonconformity is described in a separate Nonconformity Report (F 05-24). Major nonconformities are closed within 90 days of the last day of the audit.<\/li>\n<li><strong>Stage 2 of the initial audit.<\/strong> If it is not carried out within 6 months after stage 1, stage 1 is repeated. No new application or new contract is required.<\/li>\n<li><strong>Audit team.<\/strong> The client is informed in advance of the composition of the team, including technical experts, interpreters and observers.<\/li>\n<\/ul>\n<p>The current version of the General Terms and Conditions is always available at <a href=\"https:\/\/incert.bg\/en\/\">www.incert.bg<\/a>. We recommend that certified clients familiarise themselves with the changes and make sure they meet the requirements that affect them.<\/p>\n<p><a href=\"https:\/\/incert.bg\/wp-content\/uploads\/2026\/11\/d-03-01-general-terms-and-conditions-for-certification-en.pdf\" target=\"_blank\" rel=\"noopener\"><strong>General Terms and Conditions for Certification Contracts (D 03-01)<\/strong><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>INCERT applies new General Terms and Conditions for Certification Contracts (D 03-01), replacing the Certification Rules: remote audits, confidentiality, payments and nonconformities.<\/p>\n","protected":false},"author":2,"featured_media":16048,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_breakdance_hide_in_design_set":false,"_breakdance_tags":"","footnotes":""},"categories":[5],"tags":[],"class_list":["post-16051","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/incert.bg\/en\/wp-json\/wp\/v2\/posts\/16051","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/incert.bg\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/incert.bg\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/incert.bg\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/incert.bg\/en\/wp-json\/wp\/v2\/comments?post=16051"}],"version-history":[{"count":1,"href":"https:\/\/incert.bg\/en\/wp-json\/wp\/v2\/posts\/16051\/revisions"}],"predecessor-version":[{"id":16054,"href":"https:\/\/incert.bg\/en\/wp-json\/wp\/v2\/posts\/16051\/revisions\/16054"}],"wp:attachment":[{"href":"https:\/\/incert.bg\/en\/wp-json\/wp\/v2\/media?parent=16051"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/incert.bg\/en\/wp-json\/wp\/v2\/categories?post=16051"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/incert.bg\/en\/wp-json\/wp\/v2\/tags?post=16051"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}